We picked a date

Good morning!

Artemis loves riding in the car. Normally she is relegated to the back seat or laying down in the front but we were parked so she stood up.

The bathroom no longer looks this bad which is amazing

The kitchen is slowly coming along, I got all the top cupboards cleaned

We have a tub!!!! We carried that tub back and forth several times to make sure everything would be right when he mortared it in. I got very lucky with this guy, he is amazing! Doing this whole thing himself.

she is finally starting to feel a little more comfortable in the house, coming out to explore a little more instead of staying tucked in the corner.

the floor we chose for the bathroom, its tile!

I got one of the bottom kitchen cupboards cleaned and painted. There were at least 3 different layers of wall paper/contact paper glued in there.

Free fridge from Brandon’s parents. We got really lucky with this one. Its in good condition too.

Building a little half wall behind the tub.

and step 1 for my coffee bar, a new (to us) Keurig!!!! I got it slightly used on amazon but it came in the original box and had the filters and stuff still so it was barley used and I got it for $50 bucks less than the same one new.

I have given notice to my roommates, I now need to be fully moved out by the 15th of March. Sh*t just got real!!!!!

 

Snow and the bathroom

It may suck to drive in the snow with a bunch of people who don’t know how (cough cough, PORTLANDERS!!!!) But it sure is beautiful to see all those trees covered in snow and the river lined with snow on the banks.

Trying to defrost my car this morning. And I clocked in almost on time woohoo!!!

Artemis LOVES the snow!!!!! She loves to run around in it. And look you can actually see her against the white backdrop haahahhaahah

He is replacing some of the old floorboards that didn’t hold up quite as well as others.

We spend a great deal of time wandering around Lowes and Home Depot now. That is currently our version of a date out of the house.

This was only a few days ago! Scroll back up to see the progress.

Oh look more Home Depot!!

YES we are finally finished with the taking down part of the bathroom and are starting the building back up! As is evident by him putting flooring stuff back in. I even hammered a nail and screwed in 4 screws Monday night Woohoo! Now I can pretend that I have actually helped.

We have bought the flooring already, a dark wood-looking tile. I think by the end of next week we will at least have a working bathroom and be able to move in!

So we have the new flooring, new bathtub, new sink and vanity already bought. We still need to buy the wall tiles and are trying to decide if we want to keep the old toilet or buy a new one. I guess we will decide that after we bleach the crap (no pun intended) out of it and see what it looks like. We also still need to buy a shower curtain rod, shower curtain, shelves and decorations along with hand towels and wash cloths (we bought new towels for pretty cheap at Costco but it was just the towels).

I think within 2-3 weeks the bathroom will be done and I think within 1-2 weeks we will be moved in!!!!